Capital dredging

Jamnagar seawater intake augmentation

Capital dredging to increase the flow capacity of the existing seawater intake system.

Material removal scope
230,000 m³
Channel reach
1.4 km
Design bed width
30 m
Design bed level below chart datum
4 m

Increasing intake capacity

An augmentation study by HR Wallingford recommended widening the channel serving the seawater intake facilities. The design covers a 1.4-kilometre reach from the stilling basin towards the sea, with a 30-metre bed width and a bed level four metres below chart datum.

Dredging scope

Deep Dredging’s scope included overburden removal and excavation of the underlying rock. The planned quantity for removal was 230,000 m³.