Capital dredging
Reliance intake channel and new pump house
Intake channel excavation and rock removal for a new pump house.
Capital dredging
Capital dredging to increase the flow capacity of the existing seawater intake system.
An augmentation study by HR Wallingford recommended widening the channel serving the seawater intake facilities. The design covers a 1.4-kilometre reach from the stilling basin towards the sea, with a 30-metre bed width and a bed level four metres below chart datum.
Deep Dredging’s scope included overburden removal and excavation of the underlying rock. The planned quantity for removal was 230,000 m³.