Projects across India

Browse Deep Dredging’s work at ports, industrial intakes and inland waterways.

Aerial view of the terminal and vessels at Sikka Port

41 project entries

Company projects

Dated projects appear newest first.

Capital dredging

Case study

Jamnagar seawater intake augmentation

Capital dredging to increase the flow capacity of the existing seawater intake system.

230,000 m³ Material removal scope

Jamnagar, Gujarat2024–25

Reclamation & marine civil works

Jamnagar reclamation and bund

Land reclamation and bund construction with installation of a sluice gate.

Jamnagar, Gujarat2024–25
Excavators working in a rock cut for a Madhya Pradesh intake channel

Capital dredging

Case study

Madhya Pradesh intake channels

Rock excavation and disposal for four industrial intake channels.

4 Intake channel sites

Madhya Pradesh2023–24
Dredging plant in the Jamnagar seawater intake channel

Maintenance dredging

Case study

Jamnagar intake maintenance

Maintenance dredging at a seawater intake and stilling basin during plant operations.

20,000 Work hours without a reported incident

Jamnagar, Gujarat2023
Dredging equipment beside fishing boats at Karanja Fisheries Harbour

Capital dredging

Case study

Karanja Fisheries Harbour

Channel dredging and material disposal for construction of the new fisheries harbour.

Approx. 115,000 m³ Material removed

Uran, Maharashtra2022
Water Metro vessel on the channel in Kochi

Capital dredging

Case study

Kochi Water Metro

Channel dredging and material disposal planned around Water Metro operations.

Approx. 100,000 m³ Dredging scope

Kochi, Kerala2022
Excavator and support vessels working beside the Jamnagar intake channel

Maintenance dredging

Case study

Jamnagar intake dredging and rock removal

Maintenance dredging of the channel and stilling basin that feed the Jamnagar seawater intake.

115,000 m³ Material removed

Jamnagar, Gujarat2021
Crane barge and support vessels at the Sikka leading-light site

Reclamation & marine civil works

Case study

Sikka leading-light removal

Marine structure dismantling and seabed clearance at Reliance Sikka Port.

1,200 mm Reinforced concrete pile diameter

Jamnagar, Gujarat2021
Dredging vessels alongside the terminal at Sikka Port

Maintenance dredging

Case study

Sikka Port maintenance dredging

Berth and channel maintenance dredging in an operational port in the Gulf of Kutch.

52,000 m³ Material removed

Jamnagar, Gujarat2020–21
Cranes, barges and load-out ramps at the Dabhol breakwater

Reclamation & marine civil works

Case study

Dabhol breakwater support

Marine logistics and heavy-lift support for breakwater construction at Dabhol Port.

135,000 m³ Armour rock transport and placement scope

Anjanwel, Dabhol Port, Maharashtra

Inland dredging

PAR Bridge dredging

Sand dredging across creeks and rivers for railway bridge construction on the Western Dedicated Freight Corridor.

JNPT–Vadodara rail corridor

Surveys & underwater services

Jamnagar outfall surveys

Bathymetric and geophysical surveys for industrial outfall lines using multibeam bathymetry, side-scan sonar, sub-bottom profiling and a magnetometer.

Jamnagar, Gujarat

Reclamation & marine civil works

Jafrabad LNG Port breakwater support

Operation and management of one tremie barge and two flat-top barges for breakwater construction at the LNG port.

Jafrabad, Gujarat

Inland dredging

Valiar River mouth dredging

Maintenance dredging and reopening of the Valiar River mouth.

Vellankanni area, Tamil Nadu

Maintenance dredging

Dahej intake channel

Capital and maintenance dredging of the industrial intake channel for Reliance at Dahej.

Dahej, Gujarat

Ongoing projects

Current project updates will appear here.

Rajesh Chauhan’s project experience

Assignments from our founder’s dredging and marine infrastructure career.

Surveys & underwater services

Essar Bulk Terminal survey

Hydrographic and bathymetric survey work at the bulk terminal.

Hazira, Gujarat2020

Capital dredging

Visakhapatnam Port capital dredging

Capital dredging for a port terminal, including soft material and a 450,000 m³ rock dredging contract.

Visakhapatnam Port, Andhra Pradesh2015

Reclamation & marine civil works

Riverfront seawall

Marine civil works for a 450-metre riverfront seawall.

2013
Pipeline floats and marine plant in the Paradip pipeline case study

Subsea pipeline works

Paradip subsea pipeline trenching

Pre-trenching and backfilling for three offshore pipelines between the IOC refinery and the single buoy mooring.

Paradip Port, Odisha2010

Reclamation & marine civil works

Geobag shore protection

Shore protection work along 2.5 kilometres using geobags.

2010
Barges and cranes at Ennore Port during the maintenance dredging campaign

Maintenance dredging

Ennore Port maintenance dredging

An eight-week maintenance dredging campaign including mobilisation, offshore disposal and demobilisation.

Ennore, Tamil Nadu2009

Subsea pipeline works

Mumbai six-pipeline trench

Pre-trenching and backfilling for six pipelines in a single subsea trench.

Mumbai, Maharashtra1999

Subsea pipeline works

Hazira pipeline works

Trenching and backfilling to support pipe laying at Hazira.

Hazira, Gujarat

Have a project in mind?

Tell us where you’re working and what you need to achieve.