Capital dredging
Reliance intake channel and new pump house
Intake channel excavation and rock removal for a new pump house.
Browse Deep Dredging’s work at ports, industrial intakes and inland waterways.

41 project entries
No projects match those filters. Try another search or clear the filters.
Dated projects appear newest first.
Capital dredging
Intake channel excavation and rock removal for a new pump house.
Capital dredging
Case studyCapital dredging to increase the flow capacity of the existing seawater intake system.
230,000 m³ Material removal scope
Reclamation & marine civil works
Land reclamation and bund construction with installation of a sluice gate.

Capital dredging
Case studyRock excavation and disposal for four industrial intake channels.
4 Intake channel sites

Maintenance dredging
Case studyMaintenance dredging at a seawater intake and stilling basin during plant operations.
20,000 Work hours without a reported incident

Capital dredging
Case studyChannel dredging and material disposal for construction of the new fisheries harbour.
Approx. 115,000 m³ Material removed

Capital dredging
Case studyChannel dredging and material disposal planned around Water Metro operations.
Approx. 100,000 m³ Dredging scope

Maintenance dredging
Case studyMaintenance dredging of the channel and stilling basin that feed the Jamnagar seawater intake.
115,000 m³ Material removed

Reclamation & marine civil works
Case studyMarine structure dismantling and seabed clearance at Reliance Sikka Port.
1,200 mm Reinforced concrete pile diameter

Maintenance dredging
Case studyBerth and channel maintenance dredging in an operational port in the Gulf of Kutch.
52,000 m³ Material removed

Reclamation & marine civil works
Case studyMarine logistics and heavy-lift support for breakwater construction at Dabhol Port.
135,000 m³ Armour rock transport and placement scope
Capital dredging
Rock dredging for the construction of a pump-house well.
Inland dredging
Sand dredging across creeks and rivers for railway bridge construction on the Western Dedicated Freight Corridor.
Surveys & underwater services
Bathymetric and geophysical surveys for industrial outfall lines using multibeam bathymetry, side-scan sonar, sub-bottom profiling and a magnetometer.
Reclamation & marine civil works
Operation and management of one tremie barge and two flat-top barges for breakwater construction at the LNG port.
Inland dredging
Maintenance dredging and reopening of the Valiar River mouth.
Inland dredging
Operation and management of a cutter suction dredger for works at Kaveri.
Maintenance dredging
Capital and maintenance dredging of the industrial intake channel for Reliance at Dahej.
Subsea pipeline works
Trenching and backfilling for subsea pipelines.
Current project updates will appear here.
Assignments from our founder’s dredging and marine infrastructure career.
Surveys & underwater services
Hydrographic and bathymetric survey work at the bulk terminal.
Capital dredging
Capital dredging for a port terminal, including soft material and a 450,000 m³ rock dredging contract.
Reclamation & marine civil works
Marine civil works for a 12-kilometre pipeline protection revetment.
Reclamation & marine civil works
Marine civil works for a 450-metre riverfront seawall.
Capital dredging
Capital dredging in soft material and rock at Dabhol.

Maintenance dredging
Maintenance dredging of the tidal basin and berth pockets at the Naval Dockyard.

Reclamation & marine civil works
Capital dredging and reclamation at the intertidal site on India’s west coast.

Capital dredging
Capital dredging of the dock basin and reclamation behind Cargo Berth 9 using dredged material.

Subsea pipeline works
Pre-trenching and backfilling for three offshore pipelines between the IOC refinery and the single buoy mooring.
Reclamation & marine civil works
Shore protection work along 2.5 kilometres using geobags.

Maintenance dredging
An eight-week maintenance dredging campaign including mobilisation, offshore disposal and demobilisation.
Capital dredging
A single-contract rock dredging assignment at Visakhapatnam Port.
Capital dredging
A single-contract rock dredging assignment at Reliance Port.
Subsea pipeline works
Pre- and post-installation trenching and backfilling for 20-inch gas and 36-inch crude pipelines.
Subsea pipeline works
Pre-trenching and backfilling for six pipelines in a single subsea trench.
Reclamation & marine civil works
A large-scale reclamation assignment for Essar Steel Plant.
Subsea pipeline works
Trenching and backfilling to support pipe laying at Hazira.
Tell us where you’re working and what you need to achieve.