Maintenance dredging

Mumbai Naval Dockyard maintenance dredging

Maintenance dredging of the tidal basin and berth pockets at the Naval Dockyard.

Dredged over two seasons
Approx. 2.5 million m³
Distance to offshore disposal site
Approx. 25 km
Cranes at the waterfront of the Mumbai Naval Dockyard

Working within an operational dockyard

Rajesh Chauhan managed dredging in the impounded dock basin and around the berth pockets. The work was scheduled around movements of naval craft and strict site safety and security requirements.

Offshore disposal

Dredged material was taken to an offshore disposal site approximately 25 kilometres from the dockyard. The works used double handling in the impounded basin, alongside dredging and direct disposal for material from the berth pockets.