Subsea pipeline works

Paradip subsea pipeline trenching

Pre-trenching and backfilling for three offshore pipelines between the IOC refinery and the single buoy mooring.

Shared trench length
1.5 km
Pipelines in one trench
3 × 48 in
Trench bottom width
Nearly 60 m
Pipeline floats and marine plant in the Paradip pipeline case study

Crossing the surf zone

The single trench accommodated all three pipelines through the intertidal and surf zones. A temporary sheet-pile cofferdam at the beach supported the installation work.

Delivery

The pre-trenching, backfilling and cofferdam works were completed on schedule in September 2010.