Capital dredging

Tuticorin Port Berth 9 dredging and reclamation

Capital dredging of the dock basin and reclamation behind Cargo Berth 9 using dredged material.

Rock dredging
243,000 m³
Soft overburden
42,000 m³
Design level below chart datum
11.9 m
Grab dredger lifting rock at Tuticorin Port

Dredging beside an active terminal

The works deepened the dock basin in front of Berth 9. The team accounted for existing dock structures and operations at the adjacent coal terminal when scheduling rock excavation.

Reusing dredged material

Dredged rock and soft material were placed onshore to reclaim the area behind Cargo Berth 9.

Marine works beside the Tuticorin dock basin
Marine works beside the Tuticorin dock basin
Excavator handling rock at the Tuticorin shoreline
Excavator handling rock at the Tuticorin shoreline