Capital dredging
Visakhapatnam Port capital dredging
Capital dredging for a port terminal, including soft material and a 450,000 m³ rock dredging contract.
Capital dredging
Capital dredging of the dock basin and reclamation behind Cargo Berth 9 using dredged material.

The works deepened the dock basin in front of Berth 9. The team accounted for existing dock structures and operations at the adjacent coal terminal when scheduling rock excavation.
Dredged rock and soft material were placed onshore to reclaim the area behind Cargo Berth 9.
Tell us where you’re working and what you need to achieve.